The plans called for an alcove at the end of the hall but it wasn't framed to suit the sheetrock crew so I added an arch made from a piece of formica panel. It still needs sheetrock on the back side which is in the West bathroom, but I think it turned out OK & Lynna likes it. The two doors into the bathroom were mislabeled & got framed for 8' doors. I will fix that Saturday so the crew won't be held up on Monday.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment