Saturday, April 18, 2009
















This past week the North side fill & sidewalk was completed. Our fill & topsoil was delivered by a high tech, 40,000 lb. truck with an articulated boom & conveyor belt. The driver was able to control everything from a console that looks just like those used for RC models. Very impressive to see that huge truck backed into place with no driver in the cab. Lynna supervised everything while she was planting our new landscape. All I had to do was write the checks! The dogs soon got used to all the strangers working around our property & watched from a safe distance.



The four doors we purchased most recently were unfinished & Lynna wanted two of them hung ASAP. It was difficult to find room in my workshop & took most of the week for me to apply the multiple coats needed, but all four are done. During the periods they were drying, I got the grass mowed, helped my neighbor John tow his work truck to downtown Stayton for repairs & hung two more doors.










No comments: