Monday, June 16, 2008






Eric from Stayton heating came today & finished installing our two gas heaters. They look good & we will need heat if it gets cold again while the crew is taping the drywall. The crew kept on hanging sheetrock. They are almost done and Eduardo has been putting the edging onto the tray ceilings. Lynna went downtown & did some banking then stopped by Frere's Lumber & ordered the rest of our locksets while I sprayed weeds. The repairman came this afternoon & replaced the door on our refrigerator (dented by the movers). Jose came by and Lynna went over the paint colors she picked out. We got word from Don Albert of Stayton planning that the city will share 15% of the fire hydrant cost up to a limit of $1500.00, this is not as much as we hoped but every little bit helps.

No comments: